CONTENTS
1.0.            SCOPE
2.0              RESPONSIBILITY
3.0              SAFETY
4.0              OIL FILLED DISTRIBUTION TRANSFORMER
            TOOLS / EQUIPMENTS
            TEST EQUIPMQNTS 
            INSTALLATION PROCEDURE
            INSPECTION  & TESTING PROCEDURE
         TOOLS / EQUIPMENTS
·        Hand tools for Electricians
·        Lifting crane
·        Fork Lift
         TEST EQUIPMENT
·        Digital multimeter.
·        Ductor Tester
·        Clamp on Ammeter (Digital)
·        High pot Tester Set (with all accessories)
·        1 KV Insulation Resistance Tests 
·        5 KV Insulation Resistance Tests
·        Secondary injection set
·        Phase rotation meter.
All the testing instruments will have calibration certificate valid for minimum six months. Calibration certificate can be verified during testing.
       INSTALLATION PROCEDURE
·        The Distribution Transformer will be installed in place after completion of all civil work in Transformer Room i.e. Concrete plinth, Trenches, Fence, channels external wall etc…
·        Installation of the transformer will be co-ordinated with the civil team
·        Rails for transformer rollers will be installed
·        The transformers will be unloaded directly onto position as per approved Layout drawings.
·        Align and level the transformers.
·        Fix the transformer on the rail as per manufacture recommendation.
·        Gladding and proper termination for HV side.
·        Gladding and proper termination for 
·        Ground the transformer as per approved Earthling Layout
·        Testing of the transformer as per Inspection and Testing procedure
·        Termination of HV / LV Control and Instrument cables. Testing of HV cable shall be carried out after termination is installed and before the cable is finally bolted to the HV terminal of the transformer
·        Installation shall be carried out fully complying with manufacturer’s recommendation and procedures.
·        Installation check list will be submitted to Engineer for approval
·        Tighten the bolts with torque wrench as per manufacturer recommendation
·        Necessary site inspection requests shall be submitted to Engineer during the above activities at site.
·        Maintenance procedure / Instructions shall be furnished to maintenance team / Engineer during delivery of materials at site.
                INSPECTION OF TRANSFORMER
·        Check Transformer for any Physical damage
·        Check nameplate rating and tagging
·        Check if installation is made as per approved drawing and in line with vendor recommendations
·        Check Cable glanding and termination
·        Check operation and condition of tapping switch 
·        Check Earthing
·        Check Cable and Cable Tray supports
·        Check protection devices i.e. winding temperature switch / thermometer
·        Check door locks for HV and LV Terminal boxes
            TESTING OF TRANSFORMER
The following Test of the Transformer will be carried out:
·        Insulation Resistance winding 
·        Megger of winding HV side 5000V megger
·        Measurement of winding resistance 
·        Measurement of impedance voltage on all tap’s
·        Measurement of no load loss
·        Measurement of load losses at principle tap and extremes
·        Induced AC voltage withstand voltage test with measurement of partial discharge
·        Separate source AC voltage withstand voltage test
·        Measurement of Voltage ratio between primary and secondary winding
·        Check operation of winding temperature switch / indicator
·        Check vector group by voltmeter method
·        Check phase sequence
·        Check polarization index
·        Applied over voltage test at 2000V, AC, 60 sec. on wiring and supervisory equipment
·        Any other test as stated in ADDC Specs 