1500 KVA PACKAGE UNIT SUBSTATION

CONTENTS

1.0. SCOPE

2.0 DEFINITIONS

3.0 RESPONSIBILITY

4.0 STATEMENT OF COMPLIANCE

5.0 SAFETY

6.0 PREFABRICATED SUBSTATION

6.1 TOOLS / EQUIPMENTS

6.2 TEST EQUIPMQNTS

6.3 INSTALLATION PROCEDURE

6.4 INSPECTION & TESTING PROCEDURE

6.4.1 INSPECTION OF PREFABRICATED SUBSTATION

6.4.2 TESTING OF PREFABRICATED SUBSTATION

1.0 SCOPE

This method statement covers the manufacturing, supply, installation, pre-commissioning test, factory testing, marking, transportation to site, installation, site testing carried out at the source, procedure and instructions for materials inspection upon arrival at site, the requirement and instruction for executing the activities listed under this section up to pre-commissioning, commissioning and final hand over of the works.

The 11/0.4 KV prefabricated substation equipped with

Ÿ Fully enclosed vandal and weather proof housing made of Alu Zinc

Ÿ 11 KV RF6 Gas insulated RMU equipped with

a) Vacuum or SF6 breaker with self powered protection for transformer feeder

a) Load break switches for incoming / outgoing feeders with motor drive provisions.

Ÿ 500KVA hermetically sealed 11/0.433 transformer (oil type)

Ÿ 11 KV control and protection equipment

Ÿ CT’s and VT’S

Ÿ 0.4 KV Flange connected Feeder pillar.

Ÿ Indicating instrument

2.0 DEFINITIONS

SEE – Site Electrical Engineer, ST – Survey Team, S/s – Substation, TF – Transformer, FP – Feeder Pillar, TRM – Tee Ring Main unit, QRM – Quad Ring Main unit, RMU – Ring Main Unit, P/U – Package Unit, CT – Current Transformer, VT – Voltage Transformer.

3.0 RESPONSIBILITY

This is the responsibility of the Site Electrical Engineer and safety officer to ensure that this method Statement and Safety Procedures are followed during the execution of the work.

4.0 STATEMENT OF COMPLIANCE

We hereby confirm that we shall comply all the procedures and execute the subject works as per the fullest requirement, satisfaction of end user and specifications

A constant supervision of works shall be done by qualified Electrical Engineer and certified safety officer.

Material shall be used for assembly of Prefabricated S/s are designed in accordance with the standards and system characteristics as stated in corporate ADDC specifications

5.0 SAFETY

1) All work forces to be involved in execution of the Switchgear errection shall undergo safety induction training before starting the site activities. Prior to the commencement of any activities, the workforce will receive an induction talk on the project site safety requirements.

2) The necessary permits that may be required to work near existing services will be obtained. Any special conditions imposed upon these permits will be implemented.

3) The use or restriction of specific Electrical & mechanical equipment, whilst locating or excavating near the existing cables and other services will be implemented. The contractor shall utilize the manpower whomever obtain security passes. Company shall be responsible for all activities and interfaces related to this project

6.0 PREFABRICATED SUBSTATION

6.1 TOOLS / EQUIPMENTS

· Hand tools for Electricians

· Lifting crane

· Fork Lift

6.2 TEST EQUIPMENT

· Digital multimeter.

· Ductor Tester

· Clamp on Ammeter (Digital)

· High pot Tester Set (with all accessories)

· 1 KV Insulation Resistance Tests

· 5 KV Insulation Resistance Tests

· Secondary injection set

· Phase rotation meter.

All the testing instruments will have calibration certificate valid for minimum six months. Calibration certificate can be verified during testing.

6.3 INSTALLATION PROCEDURE

· The prefabricated substation will be installed in place after completion of all civil work in prefabricated substation room i.e. Concrete plinth, Trenches, Fence, channels external wall etc…

· Installation of the prefabricated substation will be co-ordinate with civil and other teams and all other activities.

· Transformer shall be located at the middle of the prefabricated substation

· TRM and the FP will be placed at each end of the prefabricated S/s.

· Rails for package unit rollers will be installed

· The pre fabricated S/s will be unloaded directly onto position as per approved Layout drawings.

· Align and level the pre fabricated S/s.

· Fix the prefabricated S/s on the rail as per manufacture recommendation.

· Gladding and proper termination for HV.

· Gladding and proper termination for LV side in the FP.

· Ground the prefabricated S/s as per approved Earthling Layout.

· Testing of the prefabricated S/s as per Inspection and Testing procedure

· Termination of HV / LV Control and Instrument cables. Testing of HV cable shall be carried out after termination is installed and before the cable is finally bolted to the HV terminal of the transformer

· Installation shall be carried out fully complying with manufacturer’s recommendation and procedures.

· Installation check list will be submitted to Engineer for approval.

· Tighten the bolts with torque wrench as per manufacturer recommendation

· Necessary site inspection requests shall be submitted to Engineer during the above activities at site.

· Maintenance procedure / Instructions shall be furnished to maintenance team / Engineer during delivery of materials at site.

6.4 INSPECTION AND TESTING PROCEDURE

6.4.1 INSPECTION OF PREFABRICATED SUBSTATION

· Check prefabricated S/s for any Physical damage

· Check nameplate rating and tagging

· Check if installation is made as per approved drawing and in line with vendor recommendations

· Check Cable glanding and termination

· Check operation and condition of tapping switch in the transformer

· Check Earthing for the prefabricated S/s.

· Check Cable and Cable Tray supports.

· Check protection devices i.e. winding temperature switch / thermometer

· Check door locks for HV and LV Terminal boxes

6.5.1 TESTING OF PREFABRICATED SUBSTATION

The following Test of the Prefabricated S/s will be carried out:

· Insulation Resistance winding LV side 1000V megger for the transformer

· Megger of winding HV side 5000V megger

· Measurement of winding resistance LV and HV side by using High resistance ductor Test

· Measurement of impedance voltage on all tap’s for the transformer

· Measurement of no load loss

· Measurement of load losses at principle tap and extremes

· Induced AC voltage withstand voltage test with measurement of partial discharge

· Separate source AC voltage withstand voltage test

· Measurement of Voltage ratio between primary and secondary winding

· Check operation of winding temperature switch / indicator

· Check vector group by voltmeter method

· Check phase sequence

· Check polarization index

· Applied over voltage test at 2000V, AC, 60 sec. on wiring and supervisory equipment

· Check the earthing details of the prefabricated S/s and the earthig value. (The value of earthing is less than 2Ω).

· ITP forms for SF6 Gas filling and pressure testing could not be provided, as such test shall be carried out at factory (i.e, Routine test). Routine test certificate shall be submitted during the material delivery at site.

· Any other test as stated in ADDC Specs

All above Tests shall be recorded in Pre-commissioning Test forms.

BEST PAYING KEYWORDS MEDICAL RELATED

BEST PAYING KEYWORDS MEDICAL RELATED


medifast weight loss $48.18
mesothelioma lawyers $44.45
medifast diet $36.28
mesothelioma attorneys $32.29
mesothelioma lawyers $32.26
accutane class action $30.12
viagra for women $27.71
michigan plastic surgery $24.68
medifast $24.44
mesothelioma lawyer $24.28
mesothelioma $24.03
female viagra $23.33
cosmetic surgery michigan $22.88
plastic surgery la jolla $22.87
plastic surgery la jolla $22.87
accutane lawsuit $22.42
mesothelioma attorney $22.39
mesothelioma treatments $21.84
plastic surgery cincinnati $21.12
pro active acne treatment $21.06
accutane lawsuits $20.80
plastic surgery staten island $20.25
beverly hills plastic surgery $20.14
beverly hills plastic surgery $20.14
plastic surgery staten island $20.05
cosmetic surgery los angeles $19.79
medifast inc $19.69
laser eye surgery seattle $19.37
mesothelioma texas $19.33
cancer research uk $18.19
eye surgery los angeles $18.11
malignant mesothelioma $17.95
acne complex $17.90
peritoneal mesothelioma $17.71
pro active acne $16.96
More Medical Keywords ..


BEST PAYING REAL ESTATE KEYWORDS



eugene realestate $27.69
realator school $15.60
find a realator $11.91


HIGHEST PAYING SOFTWARE KEYWORDS


software escrow $31.24
billing software $19.35
human resources software $17.78
spy sweeper $17.21
accounting software $15.90
spyware detection $15.46
small business software $14.87
inventory management software $14.38
pestpatrol $14.24
optimization software $14.19
webroot spy sweeper $13.83
payroll software $13.73
spam software $13.49
webroot spy $13.43
spy sweeper download $13.38
software mirroring $13.12
fundraising software $12.81
software configuration management $12.53
great plains software $12.20
software distribution $12.14
web survey software $11.97
backup software $11.75
risk management software $11.63
antispam software $11.53
software management $11.32
video conferencing software $11.19
market research software $11.04
business software $10.50
spyware removal $10.49
spyware remover $10.09
spyware blocker $10.09


HIGH PAYING KEYWORDS - TELECOM NICHE



sprint cell phone accessories $25.44
sprint cell phone $19.99
nextel cell phone $18.86
sprint phone $12.81
matrix cell phone $12.25
cell phone sync $11.12
at&t cell phone service $11.01
international cell phone rental $10.49
rental cell phone $10.12
sprint cell phone service $10.07
singular wireless $21.81
cingular wireless $17.26
wireless crm $15.13
cordless vacuum $13.80
wireless credit card $13.62
wireless credit card machine $13.49
wireless credit card processing $12.63
att wireless service $12.39
wireless pos $12.20
cingular wireless plans $11.27
att wireless $11.17
aircard $10.92
verizon wireless com $10.18


TOP KEYWORDS - AUTOMOBILE RELATED


auto insurance quote $57.18
auto quote $45.01
auto insurance quotes $39.24
nj auto insurance $36.31
auto quotes $33.13
auto insurance ontario $33.07
safe auto insurance $31.82
insurance auto florida $31.38
auto insurance $31.38
auto accident attorney $29.51
michigan auto accident $29.04
san antonio auto $27.92
new york auto insurance $27.72
austin auto $25.47
auto insurance ca $23.03
mercury insurance auto $21.03
auto nation $20.77
auto refinance $20.56
auto refinance loans $20.16
las vegas auto $18.23
philadelphia auto $17.75
auto insurance canada $17.74
auto owners insurance $17.59
denver auto $16.98
auto accident $15.15
auto comparison $15.04
auto loan rate $14.44
auto $13.40
auto glass $12.19
auto loan $11.68
auto loans online $11.50
auto loans $11.46
auto rental $11.29
new jersey auto $11.23
auto warranty $10.93


BEST KEYWORDS - GAMBLING AND CASINO



wynn casino $21.29
suncoast casino $16.58
online casinos $14.63
online gambling $14.41
online casino $12.80
wynn casino las vegas $12.61
tropicana casino $11.75
casino on line $10.87
tropicana hotel and casino $10.84
alienware $16.45
offshore gambling $15.09
gambling license $14.99
online gambling $14.41
gambling on line $10.68
wynn casino $21.29
hold everything $20.56
online casino $12.80
tropicana casino $12.27
monte carlo resort and casino $10.51
monte casino $10.25

HIGHEST PAYING KEYWORDS -ELECTRONICS NICHE


laptop data recovery $23.60
vaio notebook $22.88
laptop pcs $18.85
computer notebooks $18.49
sony cyber shot dsc w7 digital camera $17.61
laptop computers $16.18
notebooks $13.79
rugged laptop $13.55
pc laptops $13.43
laptops $13.34
vaio laptop battery $12.56
toshiba laptop computers $12.07
macintosh laptop $12.00
laptop notebook $11.51
notebook pc $11.48
laptop mounts $11.32
notebook computers $11.31
vehicle laptop $10.32
dsc p10 digital camera $10.05


HIGH PAYING DATING KEYWORDS


singles in las vegas $20.95
las vegas singles $19.21
albuquerque singles $12.32
pensacola singles $12.19
african american singles $11.79
american christian singles $10.60

TOP PAYING KEYWORDS

austin dwi $66.89
austin dwi attorney $58.30
san diego dui attorney $54.56
houston criminal attorney $47.44
san diego dui $42.83
dwi texas $40.89
dui attorneys $40.19
dwi attorney $39.90
dui attorney $39.11
dui attorney $39.11
dui attorney $39.11
dui lawyer $38.49
lawyer dui $38.49
dui lawyers $37.57
federal criminal attorney $35.80
car accident lawyer $35.67
dwi attorneys $35.32
criminal lawyers $34.19
new york criminal attorney $33.95
auto accident attorney $33.19
auto accident lawyer $33.13
dwi lawyer $32.31
dwi lawyer $32.31
texas dwi law $31.02
car accident attorney $30.16
car accident attorney $30.16
california tax attorney $29.56
dwi in minnesota $29.37
motorcycle accident attorney $28.93
washington dui $28.38
lemon law attorney $28.25
lemon law $27.95
help attorney $27.92
injury lawyers $27.88
dallas dwi $27.68
wrongful death attorney $27.25
mesothelioma attorney $27.20
personal injury lawyer $26.72
san diego personal injury attorney $26.58
accident lawyer $26.55
personal injury attorney $26.32
personal injury attorney $26.32
tax attorney $25.83
tax attorney $25.83
alaska lawyer $25.77
minnesota dwi laws $25.75
federal lawyer $25.72
dallas personal injury attorney $25.58
lawyer injury $25.16
death lawyer $25.11
More Legal Keywords ..
HIGHEST PAYING KEYWORDS -FINANCIAL NICHE



auto insurance quote $57.18
college loan consolidation $53.52
car insurance quote $46.89
federal loan consolidation $46.62
online car insurance $41.92
term life insurance quote $40.43
cheap car insurance $39.79
student loan consolidation $39.45
auto insurance quotes $39.24
online insurance quotes $37.63
student loan information $37.32
equity loan rates $36.53
nj auto insurance $36.31
student loan consolidation center $35.89
debt consildation $35.83
chase credit cards $35.02
student loan refinancing $34.89
discount car insurance $34.34
life insurance quote $34.26
homeowners insurance quotes $33.61
mortgage loans $33.17
mortgage loans $33.17
mortgage refinancing $33.08
equity line of credit $33.05
college loans $32.91
best mortgage rates $32.65
student loans $32.54
loan refinancing $32.44
us mortgage rates $32.38
instant insurance quote $32.37
term life insurance quotes $32.11
consolidation loan $32.03
loan refinance $31.95
car insurances $31.92
safe auto insurance $31.82
insurance auto florida $31.38
auto insurance $31.38
equity line of credit $30.71
gmac mortgages $30.46
mortgages for self employed $30.45
car insurance california $30.17
in car insurance $29.84
best mortgage $29.53
refinancing mortgages $29.43
line of credit $29.27
prequalify loan $28.98
loans com $28.75
business credit report $28.40
whole life insurance quotes $28.17
new york auto insurance $27.72
online mortgages $27.71
student loan $27.61
cheap house insurance $27.45
low cost life insurance $27.25
school loan consolidation $26.99
citi credit $26.80
manhattan mortgages $26.70
school loans $26.61
term insurance $26.58
second mortgage $26.56
credit report com $26.48
auto ins $26.21
consolidation $25.90
line of credit $25.57
landlords insurance $25.46
low mortgage $25.45
commercial vehicle insurance $25.37
credit consolidation $25.32
bad credit mortgages $25.22
bad credit mortgages $25.22
discount life insurance $25.22
More Financial Keywords .....

TOP PAYING HOSTING AND DOMAIN NAMES KEYWORDS

Bluehost Review

register a domain name $34.51
domain registrations $31.39
servers dedicated $29.47
how to register a domain name $26.84
domaine names $26.00
register domain names $25.83
search domain name $24.75
domain register $24.25
domain registration $23.97
internet domain registration $23.58
yahoo webhosting $22.05
domain registering $21.78
counter strike dedicated servers $21.65
buy domain name $21.23
registering domain names $20.71
domain check $20.21
buy a domain name $20.12
domain search $19.83
dedicated server $19.73
managed dedicated servers $19.56
domain name registrations $19.55
eu domain registration $19.52
domain searches $19.28
domain names $19.06
domain name registration $19.01
dedicated linux hosting $18.35
available domain name $18.31
linux dedicated hosting $18.20
dedicated web hosting $18.04
hosting domain registration $17.87
dedicated windows server hosting $17.74
dedicated web hosting $17.63
hosting dedicated $17.58
dedicated hosting $17.30
managed dedicated hosting $17.30
domain name availability $16.99
ca domain name $16.64
web domain $16.58
dedicated web server $16.56
domain names canada $16.53
dedicated server hosting $16.14
dedicated hosting server $16.03
cheap domain names $16.00
register domains $15.92
dedicated windows hosting $15.90
mohaa dedicated server $15.87
inexpensive domain $15.70
domain name $15.69
dedicated server web hosting $15.44
Domain $15.38
domain name registration search $15.37
uk dedicated hosting server $15.36
unix dedicated server $15.17
cheap domain register $15.03
dedicated sql server $15.03

Friday, December 4, 2009

Oil Filled Distribution Transformer

CONTENTS

1.0. SCOPE

2.0 RESPONSIBILITY

3.0 SAFETY

4.0 OIL FILLED DISTRIBUTION TRANSFORMER

TOOLS / EQUIPMENTS

TEST EQUIPMQNTS

INSTALLATION PROCEDURE

INSPECTION & TESTING PROCEDURE

TOOLS / EQUIPMENTS

· Hand tools for Electricians

· Lifting crane

· Fork Lift

TEST EQUIPMENT

· Digital multimeter.

· Ductor Tester

· Clamp on Ammeter (Digital)

· High pot Tester Set (with all accessories)

· 1 KV Insulation Resistance Tests

· 5 KV Insulation Resistance Tests

· Secondary injection set

· Phase rotation meter.

All the testing instruments will have calibration certificate valid for minimum six months. Calibration certificate can be verified during testing.

INSTALLATION PROCEDURE

· The Distribution Transformer will be installed in place after completion of all civil work in Transformer Room i.e. Concrete plinth, Trenches, Fence, channels external wall etc…

· Installation of the transformer will be co-ordinated with the civil team

· Rails for transformer rollers will be installed

· The transformers will be unloaded directly onto position as per approved Layout drawings.

· Align and level the transformers.

· Fix the transformer on the rail as per manufacture recommendation.

· Gladding and proper termination for HV side.

· Gladding and proper termination for LV side and Control Cables

· Ground the transformer as per approved Earthling Layout

· Testing of the transformer as per Inspection and Testing procedure

· Termination of HV / LV Control and Instrument cables. Testing of HV cable shall be carried out after termination is installed and before the cable is finally bolted to the HV terminal of the transformer

· Installation shall be carried out fully complying with manufacturer’s recommendation and procedures.

· Installation check list will be submitted to Engineer for approval

· Tighten the bolts with torque wrench as per manufacturer recommendation

· Necessary site inspection requests shall be submitted to Engineer during the above activities at site.

· Maintenance procedure / Instructions shall be furnished to maintenance team / Engineer during delivery of materials at site.

INSPECTION OF TRANSFORMER

· Check Transformer for any Physical damage

· Check nameplate rating and tagging

· Check if installation is made as per approved drawing and in line with vendor recommendations

· Check Cable glanding and termination

· Check operation and condition of tapping switch

· Check Earthing

· Check Cable and Cable Tray supports

· Check protection devices i.e. winding temperature switch / thermometer

· Check door locks for HV and LV Terminal boxes

TESTING OF TRANSFORMER

The following Test of the Transformer will be carried out:

· Insulation Resistance winding LV side 1000V megger

· Megger of winding HV side 5000V megger

· Measurement of winding resistance LV and HV side by using High resistance ductor Test

· Measurement of impedance voltage on all tap’s

· Measurement of no load loss

· Measurement of load losses at principle tap and extremes

· Induced AC voltage withstand voltage test with measurement of partial discharge

· Separate source AC voltage withstand voltage test

· Measurement of Voltage ratio between primary and secondary winding

· Check operation of winding temperature switch / indicator

· Check vector group by voltmeter method

· Check phase sequence

· Check polarization index

· Applied over voltage test at 2000V, AC, 60 sec. on wiring and supervisory equipment

· Any other test as stated in ADDC Specs

All above Tests shall be recorded in Pre-commissioning Test forms